Master Bathroom Remodel Steeplechase

MasterBath Remodel … Objective was to bring light into the shower area from existing skylight (was enclosed) by opening up to the ceiling (12′ faulted ceiling) and enlarge a number of areas as much as possible. Started with removal of the tub step (not needed), shifting inside shower wall to accommodate a large shelf, larger in-shower seating, niche shelving. All plumbing and light fixtures were updated along with removing all wallpaper and painting walls, ceiling and cabinets/trim. This is a walk-in shower not requiring a glass door.  Besides tiling shower and tub areas, flooring was replaced with tile that was accented in the shower.

See the following photo gallery for additional details —

0 comments on “Master Bathroom Remodel SteeplechaseAdd yours →

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: